High-Efficacy High Bay
Contact BOWI sales for detailed specifications and pricing.

200lm/W with a power range covering mainstream high-bay retrofits, power factor above 0.9 and cool white output — for workshops, warehouses, sports halls and parking structures, especially retrofit projects selected by output and efficacy.
Key Features
- 01200lm/W lowers installed wattage at equal illuminance — ideal for large plant retrofits
- 02Continuous power range allows step-by-step selection by suspension height and floor illuminance
- 03Power factor above 0.9 cuts reactive losses and fits existing plant distribution capacity
- 04Cool white suits high-recognition task surfaces in workshops
- 05Simple construction with low maintenance and replacement cost for bulk retrofit projects
| Category | Industrial Lighting |
| Brand | BOWI |
| Origin | Changzhou, Jiangsu, China |
| Customization | OEM / ODM Available |
Request the full specification sheet
Custom manufacturing from samples or drawings is available. Full model parameters, specification sheets and pricing are provided by our sales team project by project.
Questions about the High-Efficacy High Bay
Which applications does the High-Efficacy High Bay suit?
It is specified mainly for Factory workshops, Warehouses, Sports halls, Parking structures, Large plant spaces. Selection follows the room class, mounting condition and target illuminance; BOWI issues a layout and quantity recommendation per project.
What are the key construction points of the High-Efficacy High Bay?
200lm/W lowers installed wattage at equal illuminance — ideal for large plant retrofits; Continuous power range allows step-by-step selection by suspension height and floor illuminance; Power factor above 0.9 cuts reactive losses and fits existing plant distribution capacity.
How can I get the full specification sheet for the High-Efficacy High Bay?
This site covers positioning and construction rather than model-level parameters. Send your application and quantity through the contact page and the engineering team replies with the datasheet, IES file and quotation.
